Re: [GSoC][PATCH v2 0/4] t: port reftable/basics_test.c to the unit testing
- From
Patrick Steinhardt <ps@pks.im>
- Date
- May 29, 2024, 09:29 UTC
- Message-ID
- <Zlb1lLh-DcsOO2La@tanuki>
- In-Reply-To
- <20240529070341.4248-1-chandrapratap3519@gmail.com>
On Wed, May 29, 2024 at 12:25:08PM +0530, Chandra Pratap wrote:
Show 11 quoted lines
> In the recent codebase update (commit 8bf6fbd, 2023-12-09), a new unit
> testing framework written entirely in C was introduced to the Git project
> aimed at simplifying testing and reducing test run times.
> Currently, tests for the reftable refs-backend are performed by a custom
> testing framework defined by reftable/test_framework.{c, h}. Port
> reftable/basics_test.c to the unit testing framework and improve upon
> the ported test.
>
> Mentored-by: Patrick Steinhardt <ps@pks.im>
> Mentored-by: Christian Couder <chriscool@tuxfamily.org>
> Signed-off-by: Chandra Pratap <chandrapratap3519@gmail.com>The evolution of a patch series can be followed a bit easier if subsequent versions are attached to the initial thread. You can do this by passing e.g. `--in-reply-to=<message-id>` to git-format-patch(1), where the message ID is the one of the cover letter of the first version.
I'd also recommend to attach a range diff to your cover letter via the `--range-diff=` parameter. This range diff helps the reviewer to spot what has changed between your preceding version and this one.
Patrick